Document Details Page

Search TRRP online library of documents and data

ID: 1213

Stalnaker, C and Wittler, R J (2000) Implementation Plan for the Preferred Alternative of the TREIS/R. Available: https://www.trrp.net/library/document?id=1213.

The proposed action consists of 6 components: 1) an increased flow regime and associated OCAP for managing releases and reservoir levels; 2) a channel rehabilitation program (mechanical rehabilitation); 3) a coarse and fine sediment management program; 4) infrastructure modifications; 5) upslope watershed restoration; and 6) an Adaptive Environmental Assessment and Management organization.

First Posted: 2011-06-21 01:29:14

Post Updated: 2011-10-18 09:50:12