Inter-Disciplinary Team (IDT)
Meeting
2015-08-27 07:00:00
to
2015-08-27 07:00:00
Description: Monthly coordination call of the IDT.
Location: Conference Call
Point of Contact: Joe Polos (joe_polos@fws.gov), US Fish and Wildlife Service, 707-825-5149
Files:
Meeting Materials:
Attachement 3. Design team effectiveness monitoring pre-proposal ranking.
[19.42 KB] Attachment 3. TRRP Design Team Monitoring Proposal Ranking Aug 20151.xlsx
Design team ranking (by individual design team with summary rankings) of the pre-proposals submitted for channel rehabilitation effectiveness monitoring data needs
Published: -
Added: 2015-09-28 17:36:20
Updated: 2015-09-28 17:36:20.Attachment 2. TRRP design team pre-proposals Aug 2015
[1.05 MB] Attachment 2. TRRP Design team pre-proposals Aug 20151.zip
Pre-porpsoals submitted to the design team to address effectiveness monitoring needs.
Published: -
Added: 2015-09-28 17:34:18
Updated: 2015-09-28 17:34:18.Attachement 1. Design team comments on construction and design schedule
[128.40 KB] Attachment 1. Design Team Comments on Construction & Design Schedule 8_31_2015 1.pdf
Design team comments on construction and design schedule, 8/31/2015
Published: -
Added: 2015-09-28 17:32:58
Updated: 2015-09-28 17:32:58.
Meeting Summary:
Meeting notes
[27.65 KB] IDT conf call notes Aug 27 20151.pdf
Notes from Aug 27, 2015 IDT conference call
Published: -
Added: 2015-09-28 17:30:21
Updated: 2015-09-28 17:30:21.
First Posted: 2015-09-28 17:29:12
Post Updated: 2015-09-28 17:36:21