Watershed Workgroup

quarterly meeting

2016-11-01 17:00:00
  to
2016-11-01 07:00:00

Description:

Watershed Workgroup (WWG)

November 1, 2016

Attendees:  Nick Davids(Coordinator, YTFP), J.D. Lewis (TRRP), Phil Fishella (USFS), James Lee (HVT/TRRP), Nancy Snodgrass (DWR), Sean Ledwin (HVT), Donna Rupp (TCRCD), Josh Smith (WRTC), Bill Brock (USFS), Kyle De Julio (YTFP), Andy Hill (CDFW), Jennifer Norris (TRRP), Wes Smith (NMFS/OAI), Mark Lancaster (5C)

Summary

  •               4d Sec 10 Road Maintenance

    They also utilize Six Rivers Programmatic and rely on others for their programmatic.

     

    • Wes Smith lead a discussion on the TRRP Programmatic Consultation for Watershed Actions
    • Carolyn Cook gave a discussion on the Six Rivers Programmatic

           Identified various needs with input from locals and tribes, developed toolbox approach:

    Road Decommissioning is not included.

    • Signed in March 2012 and is good for 10 years.

      Has limitations such as:  Trees, sediment input, # of projects, construction timeline, etc.

       

      • The WWG updated the FOA for this fiscal year and plans on updating the document for an easier read for future years, and possibly adding a section to allow applicants to describe the scalability of their respective projects.
      • The timeline and Flow Chart were discussed, as well as a brief overview of road decommissioning.

      Action Items and unfinished business:

      <p style="\&quot;color:" rgb(0,="" 0,="" 0);="" font-family:="" arial,="" helvetica,="" sans-serif;\"=""> Need to adopt list of proposed actions, adopt flow chart for FY 17 projects, discuss permitting timelines with Brandt G., and finalize a decision for a possible “scalability” description on the FOA

Location:

Point of Contact: Nicolas Davids (ndavids@yuroktribe.nsn.us), Yurok Tribal Fisheries Program, 970-903-2918

Files:



First Posted: 2016-12-19 18:47:38

Post Updated: 2017-08-02 01:02:03